{"id":95685,"date":"2026-04-02T11:19:59","date_gmt":"2026-04-02T09:19:59","guid":{"rendered":"http:\/\/www.acceptmission.com\/?post_type=docs&#038;p=95685"},"modified":"2026-04-16T12:33:04","modified_gmt":"2026-04-16T10:33:04","password":"","slug":"innovation-project-management","status":"publish","type":"docs","link":"https:\/\/www.acceptmission.com\/es\/knowledge\/innovation-project-management\/","title":{"rendered":"Gesti\u00f3n de proyectos de innovaci\u00f3n."},"content":{"rendered":"<h2 class=\"wp-block-heading\">Por qu\u00e9 es necesaria esta funci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Una vez aprobada una idea, el trabajo ya no consiste en recoger aportaciones. Se convierte en ejecuci\u00f3n, seguimiento del progreso, propiedad, plazos, movimiento de etapas y medici\u00f3n de resultados. Sin un flujo de trabajo de proyecto estructurado, los equipos de innovaci\u00f3n pueden perder visibilidad sobre lo que est\u00e1 avanzando y el valor que se est\u00e1 creando.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La gesti\u00f3n de proyectos de innovaci\u00f3n ayuda a los equipos a mantener el control del trabajo de innovaci\u00f3n activo. Crea una forma clara de supervisar las fases del proyecto, seguir su progreso, comparar proyectos y comprender c\u00f3mo contribuyen los esfuerzos de innovaci\u00f3n a los resultados empresariales.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">En qu\u00e9 consiste<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La gesti\u00f3n de proyectos de innovaci\u00f3n en Accept Mission es el proceso estructurado de gestionar las innovaciones aprobadas como proyectos. Ayuda a los equipos a supervisar el avance de los proyectos, a guiarlos a lo largo de las fases definidas y a medir el \u00e9xito de la innovaci\u00f3n a lo largo del tiempo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los proyectos en Accept Mission se gestionan a trav\u00e9s de embudos de proyectos. Estos embudos funcionan de manera similar a los embudos de ideas, pero se centran en la ejecuci\u00f3n en lugar de en la revisi\u00f3n de ideas. Los embudos de proyectos ayudan a los equipos a organizar los proyectos por equipo, departamento, pa\u00eds o modelo de responsabilidad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dentro del \u00e1rea de proyectos, los usuarios pueden trabajar con distintas vistas, como la vista de lista, la vista Kanban y la vista de diagrama de Gantt. Estas vistas facilitan el seguimiento diario, la progresi\u00f3n por etapas y la visi\u00f3n de la cartera.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h_2381e9db70\">V\u00eddeo sobre proyectos<\/h2>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-vimeo wp-block-embed-vimeo\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"video-shortcode\"><iframe title=\"Gesti\u00f3n de Proyectos de Innovaci\u00f3n\" src=\"https:\/\/player.vimeo.com\/video\/409399195?dnt=1&amp;app_id=122963\" width=\"1200\" height=\"675\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write; encrypted-media; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\"><\/iframe><\/div>\n<\/div><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Nivel de acceso<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Usuario avanzado<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Necesitas tener acceso al \u00e1rea de Proyectos del Innovation Studio para gestionar el avance de los proyectos. Es posible que se requieran permisos de administrador para iniciar nuevos proyectos, configurar los embudos de proyectos o vincular los embudos de ideas a los embudos de proyectos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ruta de navegaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ruta de navegaci\u00f3n: Innovation Studio \u2192 Proyectos<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00f3mo utilizar esta funci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La gesti\u00f3n de proyectos comienza cuando una innovaci\u00f3n pasa de la fase de selecci\u00f3n de ideas a la de ejecuci\u00f3n. En Accept Mission, los proyectos se utilizan para supervisar el progreso, hacer un seguimiento de los plazos, gestionar las fases y determinar si el trabajo de innovaci\u00f3n est\u00e1 generando valor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los proyectos pueden iniciarse a partir de ideas aprobadas o crearse como nuevos proyectos desde cero. Una vez que existe un proyecto, puede gestionarse en el embudo de proyectos correspondiente y revisarse a trav\u00e9s de distintas vistas de proyecto en funci\u00f3n del tipo de visi\u00f3n general que se necesite.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Instrucciones paso a paso<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Abrir <strong>Estudio de innovaci\u00f3n<\/strong>.<\/li>\n\n\n\n<li>Ir a <strong>Proyectos<\/strong>.<\/li>\n\n\n\n<li>Elija si desea revisar los proyectos existentes o iniciar uno nuevo.<\/li>\n\n\n\n<li>Si es necesario, cree un proyecto a partir de una idea aprobada o inicie un proyecto completamente nuevo.<\/li>\n\n\n\n<li>Abra el embudo del proyecto correspondiente.<\/li>\n\n\n\n<li>Utilice las vistas disponibles como <strong>Vista de lista<\/strong>, <strong>Vista Kanban<\/strong>, o <strong>Vista del diagrama de Gantt<\/strong> en funci\u00f3n del tipo de visi\u00f3n general del proyecto que necesite.<\/li>\n\n\n\n<li>Abra una tarjeta de proyecto o un registro de proyecto para actualizar detalles como el progreso, el gestor del proyecto, la fecha l\u00edmite, la etapa y las actualizaciones de estado.<\/li>\n\n\n\n<li>Mueva los proyectos por el embudo de proyectos a medida que avanzan de una fase a la siguiente.<\/li>\n\n\n\n<li>Revisar el valor, la inversi\u00f3n y la adecuaci\u00f3n de los proyectos como parte del proceso continuo de supervisi\u00f3n de los mismos.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"632\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-1024x632.png\" alt=\"imagen\" class=\"wp-image-95686\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-200x124.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-300x185.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-360x222.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-400x247.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-600x371.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-768x474.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-800x494.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-1024x632.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-1200x741.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-1536x949.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13.png 1621w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Introducci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cuando se crea un proyecto de innovaci\u00f3n, es importante hacer un seguimiento del progreso para que la innovaci\u00f3n se lleve a cabo con \u00e9xito. Todo proyecto de innovaci\u00f3n debe cumplir determinados criterios antes de poder pasar a la siguiente fase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Estas fases pueden incluir la identificaci\u00f3n del problema, la b\u00fasqueda de soluciones, la experimentaci\u00f3n, el an\u00e1lisis de viabilidad, el desarrollo y la entrega. En Accept Mission, los equipos pueden definir y gestionar estos criterios a trav\u00e9s de la configuraci\u00f3n del proyecto y la estructura del embudo del proyecto.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Embudos de proyectos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los embudos de proyectos son los flujos de trabajo estructurados que se utilizan para gestionar los proyectos de innovaci\u00f3n. Ayudan a los equipos a organizar los proyectos por responsabilidades y flujos de ejecuci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Al igual que los embudos de ideas, los embudos de proyectos pueden crearse y gestionarse por separado. Esto permite separar proyectos para distintos equipos, departamentos, pa\u00edses o modelos de propiedad.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vista de lista<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La vista de lista ofrece una visi\u00f3n sencilla de todos los proyectos vinculados a la empresa o al embudo de proyectos seleccionado. Cada columna puede ordenarse para ayudar a los usuarios a comparar r\u00e1pidamente los datos de los proyectos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La columna del \u00faltimo informe se basa en la fecha de la \u00faltima modificaci\u00f3n realizada en un proyecto. Esto ayuda a los equipos a identificar qu\u00e9 proyectos se actualizaron m\u00e1s recientemente.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"620\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-1024x620.png\" alt=\"imagen\" class=\"wp-image-95687\" style=\"aspect-ratio:1.6520392359318534;width:1110px;height:auto\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-200x121.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-300x182.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-360x218.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-400x242.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-600x363.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-768x465.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-800x484.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-1024x620.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-1200x726.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-1536x930.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14.png 1614w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Vista Kanban<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El tablero Kanban es la vista por defecto de los proyectos. Muestra todas las tarjetas del proyecto agrupadas por etapas y facilita la visualizaci\u00f3n del progreso del proyecto en todo el flujo de trabajo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cada tarjeta de proyecto presenta informaci\u00f3n \u00fatil, como la barra de progreso, el gestor del proyecto y la fecha l\u00edmite. Puede editar f\u00e1cilmente estos valores en el formulario de detalles del proyecto haciendo clic en una tarjeta de proyecto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para actualizar la progresi\u00f3n de los proyectos, cada ficha de proyecto puede desplazarse manualmente a la etapa siguiente con la funci\u00f3n de arrastrar y soltar. En cada etapa, los detalles financieros se combinan para mostrar el beneficio por etapa en la parte inferior de cada columna de etapa. El beneficio se basa en los ingresos estimados menos las inversiones en la pesta\u00f1a de puntuaci\u00f3n de la configuraci\u00f3n del proyecto.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"627\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-1024x627.png\" alt=\"imagen\" class=\"wp-image-95688\" style=\"aspect-ratio:1.632548944582616;width:1032px;height:auto\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-200x123.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-300x184.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-360x221.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-400x245.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-600x368.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-768x470.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-800x490.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-1024x627.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-1200x735.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-1536x941.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15.png 1626w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Vista del diagrama de Gantt<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La vista del diagrama de Gantt ayuda a los usuarios a comprender los plazos de los proyectos en todos los departamentos. Cada barra representa un proyecto, y los proyectos se colocan bajo el departamento vinculado a ellos en los ajustes del proyecto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Al pasar el rat\u00f3n por encima de un proyecto en el gr\u00e1fico, puede mostrarse informaci\u00f3n adicional, como el t\u00edtulo del proyecto, la fecha de inicio y la fecha de finalizaci\u00f3n. Los usuarios pueden determinar la ventana temporal que se muestra introduciendo fechas en los campos desde y hasta o utilizando el control deslizante situado debajo del gr\u00e1fico.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"640\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-1024x640.png\" alt=\"imagen\" class=\"wp-image-95691\" style=\"aspect-ratio:1.5996334173418592;width:975px;height:auto\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-200x125.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-300x188.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-360x225.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-400x250.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-600x375.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-768x480.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-800x500.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-1024x640.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-1200x750.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-1536x960.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16.png 1614w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Iniciar un proyecto de innovaci\u00f3n<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Como administrador, puedes iniciar un proyecto de innovaci\u00f3n basado en una de las ideas de innovaci\u00f3n de las misiones \u00abBandeja de entrada\u00bb, \u00abSelecci\u00f3n\u00bb o \u00abGeneraci\u00f3n de ideas\u00bb. Tambi\u00e9n puedes iniciar un proyecto completamente nuevo desde cero.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Con la funci\u00f3n \u00abProyectos\u00bb, el administrador puede supervisar el estado del proyecto, su fase, las actualizaciones de estado, los pr\u00f3ximos plazos, la adecuaci\u00f3n estrat\u00e9gica, la inversi\u00f3n en tiempo y dinero, y el valor generado. Dentro de un proyecto, tambi\u00e9n se pueden iniciar nuevas misiones, como una misi\u00f3n de ideaci\u00f3n, para ayudar a que el trabajo avance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Accept Mission lleva un registro autom\u00e1tico de las actividades pendientes de los proyectos. La plataforma est\u00e1 dise\u00f1ada para ayudar a los equipos de innovaci\u00f3n a realizar un seguimiento de los proyectos, supervisar su avance y generar valor, al tiempo que la ejecuci\u00f3n detallada de las tareas puede gestionarse en otras herramientas operativas cuando sea necesario.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuraci\u00f3n y ajustes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La gesti\u00f3n de proyectos est\u00e1 determinada por la configuraci\u00f3n de los embudos de proyectos y las configuraciones de proyectos conectadas. Revisa detenidamente la estructura del embudo del proyecto para asegurarte de que las etapas reflejan el proceso de ejecuci\u00f3n que tu organizaci\u00f3n quiere seguir.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esto puede incluir fases como la identificaci\u00f3n del problema, la b\u00fasqueda de soluciones, la experimentaci\u00f3n, el an\u00e1lisis de viabilidad, el desarrollo y la entrega. Definir claramente estos criterios ayuda a los equipos a comprender qu\u00e9 se necesita para que un proyecto pueda pasar a la siguiente fase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Si su organizaci\u00f3n utiliza diferentes flujos de trabajo de proyecto para diferentes departamentos o pa\u00edses, cree embudos de proyecto separados para mantener clara la propiedad de la ejecuci\u00f3n y los informes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ejemplo pr\u00e1ctico - Innovationlands<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Innovationlands utiliza el m\u00e9todo Accept Mission para convertir las ideas seleccionadas sobre atracciones y experiencias de los visitantes en proyectos de innovaci\u00f3n estructurados. Una vez que se aprueba un nuevo concepto de atracci\u00f3n en el embudo de ideas, el equipo de innovaci\u00f3n inicia un proyecto y lo coloca en el embudo de proyectos correspondiente para su ejecuci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El proyecto pasa por etapas como el desarrollo del concepto, la validaci\u00f3n de la viabilidad, el estudio de viabilidad, la preparaci\u00f3n de la construcci\u00f3n y la entrega. El equipo utiliza la vista Kanban para controlar qu\u00e9 proyectos est\u00e1n avanzando, la vista de lista para comparar los datos del proyecto y el diagrama de Gantt para comprender los plazos de los distintos departamentos, como Operaciones del Parque, Experiencia del Visitante y Tecnolog\u00eda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En el caso de un proyecto de atracci\u00f3n de realidad mixta, Innovationlands realiza un seguimiento del responsable del proyecto, el plazo de entrega, la inversi\u00f3n prevista y el porcentaje de avance dentro de la ficha del proyecto. A medida que el proyecto avanza por sus distintas fases, el equipo puede comprobar si sigue ajust\u00e1ndose al caso de negocio original y si est\u00e1 listo para el siguiente punto de decisi\u00f3n. Esto ayuda a Innovationlands a gestionar la ejecuci\u00f3n de la innovaci\u00f3n con mayor estructura y una mayor visibilidad en toda la cartera.<\/p>","protected":false},"excerpt":{"rendered":"<p>Why this feature is needed Once an idea is approved, the work is no longer about collecting input. It becomes about execution, progress tracking, ownership, deadlines, stage movement, and measuring results. Without a structured project workflow, innovation teams can lose visibility on what is moving forward and what value is being created. Innovation project management  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_seopress_titles_title":"Innovation project management help | Accept Mission","_seopress_titles_desc":"Learn how to use innovation project management in Accept Mission to manage innovation projects, portfolios and execution workflows.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"content-type":"","footnotes":"","_members_access_role":[],"_members_access_error":""},"doc_category":[258,254],"doc_tag":[],"glossaries":[],"knowledge_base":[317],"class_list":["post-95685","docs","type-docs","status-publish","hentry","doc_category-portfolio-overview","doc_category-project-funnels","knowledge_base-support"],"year_month":"2026-10","word_count":1198,"total_views":"2567","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"steven kop","author_nicename":"steven","author_url":"#"},"doc_category_info":[{"term_name":"Portfolio Overview","term_url":"https:\/\/www.acceptmission.com\/es\/knowledge\/non-knowledgebase\/portfolio-overview\/"},{"term_name":"Project Funnels","term_url":"https:\/\/www.acceptmission.com\/es\/knowledge\/non-knowledgebase\/project-funnels\/"}],"doc_tag_info":[],"knowledge_base_info":[{"term_name":"Support","term_url":"https:\/\/www.acceptmission.com\/es\/knowledge\/support\/","term_slug":"support"}],"knowledge_base_slug":["support"],"_links":{"self":[{"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/docs\/95685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/comments?post=95685"}],"version-history":[{"count":0,"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/docs\/95685\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/media?parent=95685"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/doc_category?post=95685"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/doc_tag?post=95685"},{"taxonomy":"glossaries","embeddable":true,"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/glossaries?post=95685"},{"taxonomy":"knowledge_base","embeddable":true,"href":"https:\/\/www.acceptmission.com\/es\/wp-json\/wp\/v2\/knowledge_base?post=95685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}