{"id":95693,"date":"2026-04-02T11:41:05","date_gmt":"2026-04-02T09:41:05","guid":{"rendered":"http:\/\/www.acceptmission.com\/?post_type=docs&#038;p=95693"},"modified":"2026-04-14T14:51:41","modified_gmt":"2026-04-14T12:51:41","password":"","slug":"task-management-introduction","status":"publish","type":"docs","link":"https:\/\/www.acceptmission.com\/fr\/knowledge\/task-management-introduction\/","title":{"rendered":"Introduction \u00e0 la gestion des t\u00e2ches"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Pourquoi cette fonctionnalit\u00e9 est-elle n\u00e9cessaire ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Les projets d'innovation comportent souvent de nombreuses activit\u00e9s impliquant diff\u00e9rentes personnes, phases et \u00e9ch\u00e9ances. Sans une m\u00e9thode structur\u00e9e de gestion des t\u00e2ches, les \u00e9quipes peuvent perdre la trace des propri\u00e9taires, ne pas respecter les d\u00e9lais et avoir du mal \u00e0 comprendre l'avancement du projet.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La gestion des t\u00e2ches aide les \u00e9quipes d'innovation \u00e0 rester organis\u00e9es au sein d'un projet. Elle permet d'avoir une vision claire de ce qui doit \u00eatre fait, des responsables et de l'\u00e9volution du travail dans le temps.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">En quoi consiste cette fonction ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La gestion des t\u00e2ches dans Accept Mission correspond \u00e0 l'espace d\u00e9di\u00e9 au suivi des t\u00e2ches au sein d'un projet d'innovation. Elle aide les \u00e9quipes \u00e0 cr\u00e9er, attribuer, mettre \u00e0 jour et suivre les t\u00e2ches du projet afin de coordonner plus efficacement le travail.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les t\u00e2ches sont g\u00e9r\u00e9es \u00e0 l'int\u00e9rieur du <strong>T\u00e2ches<\/strong> d'un projet. \u00c0 partir de l\u00e0, les utilisateurs peuvent travailler dans deux vues : <strong>Vue de la liste<\/strong> et <strong>Vue de Gantt<\/strong>. Ces vues aident les \u00e9quipes \u00e0 suivre les d\u00e9lais, la propri\u00e9t\u00e9 des t\u00e2ches, les phases et les progr\u00e8s de diff\u00e9rentes mani\u00e8res.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La gestion des t\u00e2ches fait partie int\u00e9grante de la mise en \u0153uvre des projets d'innovation. Elle facilite le suivi des projets au sein de Accept Mission, tandis que le suivi plus g\u00e9n\u00e9ral des activit\u00e9s op\u00e9rationnelles peut, si n\u00e9cessaire, continuer \u00e0 \u00eatre assur\u00e9 par d'autres outils.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Niveau d'acc\u00e8s<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Utilisateur exp\u00e9riment\u00e9<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vous devez avoir acc\u00e8s au projet d'innovation concern\u00e9 dans l'Innovation Studio pour travailler avec les t\u00e2ches du projet.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Chemin de navigation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Chemin de navigation : Innovation Studio \u2192 Projets \u2192 Ouvrir un projet \u2192 T\u00e2ches<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment utiliser cette fonction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La gestion des t\u00e2ches est utilis\u00e9e dans le cadre d'un projet pour assurer le suivi des activit\u00e9s n\u00e9cessaires \u00e0 l'avancement du projet. Elle permet d'attribuer des t\u00e2ches, de les regrouper, de mettre \u00e0 jour les \u00e9ch\u00e9ances et de suivre la progression gr\u00e2ce \u00e0 des listes et \u00e0 des vues de Gantt.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ceci est particuli\u00e8rement utile lorsque plusieurs membres de l'\u00e9quipe sont impliqu\u00e9s et que le projet comporte plusieurs phases ou \u00e9ch\u00e9ances.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Instructions pas \u00e0 pas<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Ouvrir <strong>Studio d'innovation<\/strong>.<\/li>\n\n\n\n<li>Aller \u00e0 <strong>Projets<\/strong>.<\/li>\n\n\n\n<li>Ouvrez le projet que vous souhaitez g\u00e9rer.<\/li>\n\n\n\n<li>S\u00e9lectionnez l'option <strong>T\u00e2ches<\/strong> tabulation.<\/li>\n\n\n\n<li>Choisir <strong>Vue de la liste<\/strong> ou <strong>Vue de Gantt<\/strong> en fonction de la vue d'ensemble dont vous avez besoin.<\/li>\n\n\n\n<li>Cliquez sur <strong>Ajouter une t\u00e2che<\/strong> si vous souhaitez cr\u00e9er une nouvelle t\u00e2che.<\/li>\n\n\n\n<li>Remplissez les d\u00e9tails de la t\u00e2che et enregistrez-la.<\/li>\n\n\n\n<li>Mettre \u00e0 jour les valeurs des t\u00e2ches directement dans la liste au fur et \u00e0 mesure de l'avancement du travail.<\/li>\n\n\n\n<li>Examiner r\u00e9guli\u00e8rement la propri\u00e9t\u00e9 des t\u00e2ches, les \u00e9ch\u00e9ances et l'\u00e9tat d'avancement afin de maintenir le projet sur la bonne voie.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"490\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-1024x490.png\" alt=\"image\" class=\"wp-image-95694\" style=\"aspect-ratio:2.0901371652514698;width:867px;height:auto\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-18x9.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-200x96.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-300x144.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-360x172.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-400x191.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-600x287.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-768x367.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-800x383.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-1024x490.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-1200x574.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17-1536x735.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-17.png 1624w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Vues de la gestion des t\u00e2ches<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Vue de la liste<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La vue en liste affiche une liste intelligente de toutes les t\u00e2ches du projet. Les t\u00e2ches sont toujours regroup\u00e9es en fonction de l'\u00e9l\u00e9ment <strong>Groupe par<\/strong> s\u00e9lecteur.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vous pouvez regrouper les t\u00e2ches par :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Semaine<\/strong> pour le regroupement des t\u00e2ches hebdomadaires<\/li>\n\n\n\n<li><strong>Mois<\/strong> pour les groupes de travail mensuels<\/li>\n\n\n\n<li><strong>Phases<\/strong> pour le regroupement par phase de projet<\/li>\n\n\n\n<li><strong>Statut<\/strong> pour le regroupement en fonction de l'avancement des t\u00e2ches<\/li>\n\n\n\n<li><strong>Propri\u00e9taire<\/strong> pour le regroupement par personne responsable<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Cette vue est utile lorsque vous souhaitez obtenir une vue d'ensemble pratique et modifiable des t\u00e2ches.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Vue de Gantt<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Le diagramme de Gantt pr\u00e9sente toutes les t\u00e2ches du projet dans une vue d'ensemble interactive bas\u00e9e sur le temps. Cela vous permet de mieux comprendre le calendrier, l'ordre et la progression des t\u00e2ches.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vous pouvez voir la hi\u00e9rarchie et l'\u00e9tat d'avancement des t\u00e2ches dans ce graphique et survoler les t\u00e2ches pour obtenir plus d'informations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ajouter une nouvelle t\u00e2che<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Vous pouvez cr\u00e9er une nouvelle t\u00e2che en cliquant sur le bouton <strong>Ajouter une t\u00e2che<\/strong> dans l'onglet T\u00e2ches.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les champs suivants sont disponibles lors de la cr\u00e9ation d'une t\u00e2che :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Titre<\/strong> - Le titre de la t\u00e2che. Il est obligatoire.<\/li>\n\n\n\n<li><strong>Phase<\/strong> - Un champ libre dans lequel vous pouvez saisir un nouveau nom de phase ou s\u00e9lectionner une phase existante d\u00e9j\u00e0 utilis\u00e9e par d'autres t\u00e2ches dans ce projet.<\/li>\n\n\n\n<li><strong>Propri\u00e9taire<\/strong> - La personne responsable de la t\u00e2che. Lorsque la t\u00e2che est sauvegard\u00e9e, le propri\u00e9taire re\u00e7oit une notification.<\/li>\n\n\n\n<li><strong>Date de fin<\/strong> - La date limite de la t\u00e2che. \u00c0 cette date, le propri\u00e9taire re\u00e7oit une notification de rappel.<\/li>\n\n\n\n<li><strong>Dur\u00e9e de l'accord<\/strong> - Le temps n\u00e9cessaire \u00e0 la r\u00e9alisation de la t\u00e2che.<\/li>\n\n\n\n<li><strong>Statut<\/strong> - Indique si la t\u00e2che n'est pas commenc\u00e9e, si elle est en cours ou si elle est termin\u00e9e.<\/li>\n\n\n\n<li><strong>Description<\/strong> - Une description claire de la t\u00e2che.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" width=\"990\" height=\"816\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18.png\" alt=\"image\" class=\"wp-image-95695\" style=\"width:787px;height:auto\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18-15x12.png 15w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18-200x165.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18-300x247.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18-360x297.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18-400x330.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18-600x495.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18-768x633.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18-800x659.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-18.png 990w\" sizes=\"(max-width: 990px) 100vw, 990px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Modifier les t\u00e2ches directement dans la liste intelligente<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Les t\u00e2ches de la liste intelligente peuvent \u00eatre mises \u00e0 jour directement. Tout est en direct et mis \u00e0 jour imm\u00e9diatement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Par exemple, lorsque vous modifiez l'\u00e9ch\u00e9ance, les t\u00e2ches du groupe de la semaine ou du mois sont r\u00e9organis\u00e9es automatiquement. Il en va de m\u00eame pour les autres champs visibles de la liste intelligente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La vue en liste est donc utile pour assurer un suivi rapide des projets sans avoir \u00e0 ouvrir chaque t\u00e2che s\u00e9par\u00e9ment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Avis<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Les notifications suivantes sont li\u00e9es \u00e0 des t\u00e2ches :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Une notification est envoy\u00e9e au propri\u00e9taire de la t\u00e2che lorsqu'une t\u00e2che est cr\u00e9\u00e9e ou lorsque le propri\u00e9taire de la t\u00e2che est modifi\u00e9.<\/li>\n\n\n\n<li>Une notification est envoy\u00e9e au propri\u00e9taire de la t\u00e2che le matin de la date limite de la t\u00e2che pour lui rappeler que la date limite est arriv\u00e9e.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Le rappel de l'\u00e9ch\u00e9ance n'est pas envoy\u00e9 lorsque la t\u00e2che est d\u00e9j\u00e0 termin\u00e9e.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration et ajustements<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La gestion des t\u00e2ches est disponible \u00e0 l'int\u00e9rieur de chaque projet dans le <strong>T\u00e2ches<\/strong> tab. La mani\u00e8re dont les t\u00e2ches sont utilis\u00e9es d\u00e9pend de la fa\u00e7on dont l'\u00e9quipe de projet structure les phases, la propri\u00e9t\u00e9 et les d\u00e9lais.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour que la gestion des t\u00e2ches reste efficace, il convient d'utiliser des noms de phase coh\u00e9rents, d'attribuer des responsables clairs et de mettre \u00e0 jour les statuts r\u00e9guli\u00e8rement. Cela permet d'am\u00e9liorer le regroupement des listes et la visibilit\u00e9 du Gantt.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Si les t\u00e2ches ne font pas l'objet d'un suivi appropri\u00e9, v\u00e9rifiez si l'\u00e9quipe de projet respecte les d\u00e9lais, les responsabilit\u00e9s et les mises \u00e0 jour de l'\u00e9tat d'avancement.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Exemple pratique - Zones d'innovation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Innovationlands g\u00e8re un projet visant \u00e0 introduire une nouvelle exp\u00e9rience interactive de file d'attente pour les visiteurs. L'\u00e9quipe du projet comprend des personnes issues de l'exp\u00e9rience des visiteurs, de l'exploitation du parc et de la technologie.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Au sein du projet, le responsable de l'innovation ouvre le <strong>T\u00e2ches<\/strong> et cr\u00e9e des t\u00e2ches telles que la validation du concept, l'examen de la s\u00e9curit\u00e9 op\u00e9rationnelle, la contribution au budget et la planification du prototype. Chaque t\u00e2che est attribu\u00e9e au bon propri\u00e9taire, plac\u00e9e dans une phase et assortie d'un d\u00e9lai.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lors du suivi hebdomadaire, l'\u00e9quipe utilise le <strong>Vue de la liste<\/strong> regroup\u00e9s par statut pour voir ce qui n'est pas commenc\u00e9, ce qui est en cours et ce qui est termin\u00e9. Pour planifier sur l'ensemble du calendrier, ils passent \u00e0 l'option <strong>Vue de Gantt<\/strong> pour comprendre comment les t\u00e2ches se chevauchent et si le projet est toujours dans les temps.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cela permet \u00e0 Innovationlands d'organiser le projet, d'en pr\u00e9ciser la propri\u00e9t\u00e9 et de v\u00e9rifier si le travail progresse vers la prochaine \u00e9tape du projet.<\/p>","protected":false},"excerpt":{"rendered":"<p>Why this feature is needed Innovation projects often involve many activities across different people, phases, and deadlines. Without a structured way to manage tasks, teams can lose track of ownership, miss deadlines, and struggle to understand project progress. Task management helps innovation teams stay organized inside a project. It provides a clear view of what  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_seopress_titles_title":"Task management introduction help | Accept Mission","_seopress_titles_desc":"Find Accept Mission help for Task management introduction, including practical guidance, settings and best practices for using the innovation platform.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"content-type":"","footnotes":"","_members_access_role":[],"_members_access_error":""},"doc_category":[254],"doc_tag":[],"glossaries":[],"knowledge_base":[317],"class_list":["post-95693","docs","type-docs","status-publish","hentry","doc_category-project-funnels","knowledge_base-support"],"year_month":"2026-10","word_count":934,"total_views":"2580","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Steven Kope","author_nicename":"steven","author_url":"#"},"doc_category_info":[{"term_name":"Project Funnels","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge\/non-knowledgebase\/project-funnels\/"}],"doc_tag_info":[],"knowledge_base_info":[{"term_name":"Support","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge\/support\/","term_slug":"support"}],"knowledge_base_slug":["support"],"_links":{"self":[{"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/docs\/95693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/comments?post=95693"}],"version-history":[{"count":0,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/docs\/95693\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/media?parent=95693"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/doc_category?post=95693"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/doc_tag?post=95693"},{"taxonomy":"glossaries","embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/glossaries?post=95693"},{"taxonomy":"knowledge_base","embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/knowledge_base?post=95693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}