{"id":99674,"date":"2026-05-05T18:47:59","date_gmt":"2026-05-05T16:47:59","guid":{"rendered":"http:\/\/www.acceptmission.com\/?post_type=docs&#038;p=99674"},"modified":"2026-10-14T11:12:29","modified_gmt":"2026-10-14T09:12:29","password":"","slug":"using-the-decision-matrix-view-in-an-innovation-funnel","status":"publish","type":"docs","link":"https:\/\/www.acceptmission.com\/fr\/knowledge\/using-the-decision-matrix-view-in-an-innovation-funnel\/","title":{"rendered":"Utilisation de la matrice de d\u00e9cision dans un entonnoir d'innovation"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Pourquoi cette fonctionnalit\u00e9 est-elle n\u00e9cessaire ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La vue \u00ab matrice de d\u00e9cision \u00bb aide les \u00e9quipes \u00e0 comparer et \u00e0 noter les id\u00e9es au sein d'un entonnoir d'id\u00e9es de mani\u00e8re structur\u00e9e. Elle est utilis\u00e9e lorsqu'il faut \u00e9valuer plusieurs id\u00e9es selon les m\u00eames crit\u00e8res d'\u00e9valuation avant de d\u00e9cider lesquelles doivent \u00eatre retenues.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les vues \u00ab Kanban \u00bb et \u00ab Liste \u00bb aident les utilisateurs \u00e0 g\u00e9rer le flux de travail et les donn\u00e9es relatives aux id\u00e9es. La vue \u00ab Matrice de d\u00e9cision \u00bb est ax\u00e9e sur l'\u00e9valuation, la notation, la comparaison et la hi\u00e9rarchisation. Elle rassemble les id\u00e9es et les crit\u00e8res de la fiche d'\u00e9valuation dans une seule vue d'ensemble, ce qui permet aux utilisateurs de prendre des d\u00e9cisions sans avoir \u00e0 passer d'un \u00e9cran \u00e0 l'autre ou \u00e0 consulter des feuilles de calcul distinctes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"498\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-1024x498.png\" alt=\"Tableau de bord d&#039;\u00e9valuation des id\u00e9es avec indicateurs de performance et curseurs\" class=\"wp-image-100091\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-18x9.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-200x97.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-300x146.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-360x175.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-400x194.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-600x292.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-768x373.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-800x389.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-1024x498.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-1200x583.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-1536x746.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/decision-matrix-scoring-funnel-scaled.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Un tableau de bord interactif permettant d'\u00e9valuer les projets d'innovation. Les indicateurs mettent en avant l'impact sur les clients, les niveaux d'investissement et l'alignement strat\u00e9gique.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">En quoi consiste cette fonction ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La vue \u00ab Matrice de d\u00e9cision \u00bb est une interface de notation et de comparaison int\u00e9gr\u00e9e \u00e0 l'entonnoir d'id\u00e9es. Elle affiche, \u00e0 gauche, les id\u00e9es pr\u00e9sentes dans l'entonnoir s\u00e9lectionn\u00e9 et, \u00e0 droite, les crit\u00e8res de la fiche d'\u00e9valuation associ\u00e9s, sous forme de colonnes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chaque id\u00e9e peut \u00eatre not\u00e9e directement dans la matrice. Les notes sont regroup\u00e9es sous les notes \u00ab parents \u00bb d\u00e9finies dans la fiche d'\u00e9valuation. La note totale est calcul\u00e9e automatiquement pour chaque id\u00e9e et peut servir \u00e0 comparer et \u00e0 classer les id\u00e9es.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La vue comprend \u00e9galement des r\u00e9sum\u00e9s d'id\u00e9es soutenues par l'IA dans la colonne de titre. Ces r\u00e9sum\u00e9s aident les utilisateurs \u00e0 comprendre rapidement l'id\u00e9e avant d'ouvrir plus de d\u00e9tails.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Zone de la plate-forme<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Studio d'innovation \u2013&gt; Id\u00e9es \u2013&gt; Matrice de d\u00e9cision (onglet \u00ab Afficher \u00bb)<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Niveau d'acc\u00e8s<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Utilisateur exp\u00e9riment\u00e9<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les utilisateurs doivent disposer d'un acc\u00e8s \u00e0 l'entonnoir d'id\u00e9es s\u00e9lectionn\u00e9 et d'une autorisation leur permettant de consulter et d'\u00e9valuer les id\u00e9es. L'entonnoir doit \u00eatre associ\u00e9 \u00e0 une fiche d'\u00e9valuation avant que les colonnes de cette derni\u00e8re puissent \u00eatre utilis\u00e9es dans la matrice de d\u00e9cision.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Chemin de navigation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Chemin de navigation : Innovation Studio \u2192 Id\u00e9es \u2192 S\u00e9lectionner l'entonnoir d'id\u00e9es \u2192 Matrice de d\u00e9cision<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment utiliser cette fonction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La matrice de d\u00e9cision pr\u00e9sente chaque id\u00e9e sous forme de ligne et chaque \u00e9l\u00e9ment du tableau de bord sous forme de colonne. Les premi\u00e8res colonnes restent visibles lorsque les utilisateurs font d\u00e9filer horizontalement les colonnes du tableau de bord.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La partie gauche de la matrice contient la colonne \u00ab S\u00e9lection \u00bb, la colonne \u00ab Note totale \u00bb et la colonne \u00ab Titre de l'id\u00e9e \u00bb. Les colonnes de la fiche d'\u00e9valuation apparaissent \u00e0 droite. Cela permet aux utilisateurs de garder le contexte de l'id\u00e9e \u00e0 l'\u00e9cran tout en attribuant des notes selon plusieurs crit\u00e8res.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"618\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-1024x618.png\" alt=\"Tableau de bord de la matrice de d\u00e9cision avec des mesures de notation des investissements\" class=\"wp-image-99675\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-200x121.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-300x181.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-360x217.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-400x241.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-600x362.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-768x463.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-800x483.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-1024x618.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-1200x724.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-1536x927.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.41.54-scaled.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Une matrice d\u00e9cisionnelle permet de comparer les id\u00e9es de saveurs en fonction de l'investissement et des crit\u00e8res d'\u00e9valuation. Des curseurs interactifs et des notes mettent en \u00e9vidence les performances selon diff\u00e9rents crit\u00e8res.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capture d'\u00e9cran : aper\u00e7u de la matrice de d\u00e9cision.<\/strong><br>Description : Afficher l'onglet \u00ab Matrice de d\u00e9cision \u00bb dans un entonnoir d'id\u00e9es. La capture d'\u00e9cran doit montrer la colonne \u00ab S\u00e9lection fig\u00e9e \u00bb, la colonne \u00ab Score total \u00bb, la colonne \u00ab Titre de l'id\u00e9e \u00bb et les colonnes de la fiche d'\u00e9valuation avec les champs de notation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Instructions pas \u00e0 pas<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Studio d'innovation ouverte.<\/li>\n\n\n\n<li>Aller aux id\u00e9es.<\/li>\n\n\n\n<li>S\u00e9lectionnez l'entonnoir \u00e0 id\u00e9es que vous souhaitez \u00e9valuer.<\/li>\n\n\n\n<li>S\u00e9lectionnez l'onglet \u00ab Matrice de d\u00e9cision \u00bb.<\/li>\n\n\n\n<li>Examinez le nombre total d'id\u00e9es en vue en haut de la matrice.<\/li>\n\n\n\n<li>Utilisez la colonne du titre pour lire le titre de l'id\u00e9e et la br\u00e8ve description ou le r\u00e9sum\u00e9 de l'IA.<\/li>\n\n\n\n<li>Cliquez sur une cellule du titre de l'id\u00e9e pour ouvrir la fen\u00eatre contextuelle de l'id\u00e9e.<\/li>\n\n\n\n<li>Examinez le titre complet, la description compl\u00e8te, les commentaires, les alignements strat\u00e9giques et les autres informations disponibles sur les id\u00e9es.<\/li>\n\n\n\n<li>Notez chaque id\u00e9e dans les colonnes de la fiche d'\u00e9valuation.<\/li>\n\n\n\n<li>Examinez le statut de la note parentale pour voir si elle est compl\u00e8te ou si elle doit encore \u00eatre saisie.<\/li>\n\n\n\n<li>Utilisez la colonne du score total pour comparer les id\u00e9es.<\/li>\n\n\n\n<li>Triez la colonne du score total pour identifier les id\u00e9es les mieux class\u00e9es.<\/li>\n\n\n\n<li>S\u00e9lectionnez une ou plusieurs id\u00e9es \u00e0 l'aide des cases \u00e0 cocher lorsque vous souhaitez appliquer les actions d'entonnoir disponibles.<\/li>\n\n\n\n<li>Utilisez les filtres pour r\u00e9duire les id\u00e9es pr\u00e9sent\u00e9es dans la matrice.<\/li>\n\n\n\n<li>L'option Colonnes permet d'ajouter ou de supprimer des colonnes suppl\u00e9mentaires visibles sur le c\u00f4t\u00e9 gauche de la matrice.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capture d'\u00e9cran : Fen\u00eatre contextuelle d'une id\u00e9e.<\/strong><br>Description : Affiche la fen\u00eatre contextuelle qui s'ouvre apr\u00e8s avoir cliqu\u00e9 sur la cellule du titre. Cette fen\u00eatre doit contenir le titre complet de l'id\u00e9e, sa description compl\u00e8te, des commentaires, des informations sur l'alignement strat\u00e9gique et d'autres d\u00e9tails pertinents sur l'id\u00e9e.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comprendre les colonnes<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Colonne de s\u00e9lection<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La premi\u00e8re colonne contient des cases \u00e0 cocher permettant de s\u00e9lectionner des enregistrements d'id\u00e9es. Les utilisateurs peuvent s\u00e9lectionner une ou plusieurs id\u00e9es, puis utiliser les actions disponibles pour les fiches s\u00e9lectionn\u00e9es.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Colonne du score total<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La colonne \u00ab Score total \u00bb calcule le score de chaque id\u00e9e en fonction de la fiche d'\u00e9valuation associ\u00e9e. Cette colonne peut \u00eatre tri\u00e9e afin de comparer les id\u00e9es et d'identifier les meilleures d'entre elles dans l'entonnoir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Colonne de titre<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">La colonne du titre indique le titre de l'id\u00e9e et une br\u00e8ve description ou un r\u00e9sum\u00e9 de l'IA. Cela permet aux utilisateurs de disposer rapidement d'un contexte lors de la notation. Un clic sur la cellule permet d'obtenir des informations plus d\u00e9taill\u00e9es sur l'id\u00e9e.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Colonnes du tableau de bord<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Les colonnes de la fiche d'\u00e9valuation repr\u00e9sentent la fiche d'\u00e9valuation associ\u00e9e \u00e0 l'entonnoir. Chaque colonne contient des champs d'\u00e9valuation correspondant aux crit\u00e8res pertinents de la fiche d'\u00e9valuation. En fonction de la configuration de la fiche d'\u00e9valuation, une note peut \u00eatre saisie \u00e0 l'aide de commandes telles que la saisie num\u00e9rique, des \u00e9chelles de notation, des curseurs ou des options \u00e0 s\u00e9lectionner.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les sections relatives aux scores des parents indiquent si les \u00e9l\u00e9ments de notation correspondants sont complets ou s'ils doivent encore \u00eatre renseign\u00e9s. Les notes manquantes sont mises en \u00e9vidence afin que les utilisateurs puissent rapidement identifier les \u00e9valuations incompl\u00e8tes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized is-style-default\"><img decoding=\"async\" width=\"650\" height=\"474\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.43.36.png\" alt=\"Tableau de bord des r\u00e9sultats des parents avec les investissements en temps et en argent\" class=\"wp-image-99681\" style=\"width:400px\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.43.36-16x12.png 16w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.43.36-200x146.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.43.36-300x219.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.43.36-360x263.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.43.36-400x292.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.43.36-600x438.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.43.36.png 650w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><figcaption class=\"wp-element-caption\">Un tableau de bord des performances des parents indiquant les scores globaux et par cat\u00e9gorie. Les investissements en temps et en argent sont suivis \u00e0 l'aide de curseurs de pourcentage.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capture d'\u00e9cran : champs de notation de la fiche d'\u00e9valuation.<\/strong><br>Description : Afficher plusieurs colonnes d'une fiche d'\u00e9valuation comportant diff\u00e9rents types de saisie des notes, tels qu'un curseur, une \u00e9chelle d'\u00e9valuation par \u00e9toiles et des boutons radio. La capture d'\u00e9cran doit \u00e9galement montrer les libell\u00e9s des notes principales, les statuts \u00ab Termin\u00e9 \u00bb et \u00ab Note \u00e0 attribuer \u00bb, ainsi que les indicateurs de notes manquantes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Utilisation de filtres et de colonnes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Le bouton \u00ab Filtres \u00bb permet d'affiner la s\u00e9lection des id\u00e9es affich\u00e9es dans la matrice de d\u00e9cision. Cette fonctionnalit\u00e9 est utile lorsque les utilisateurs souhaitent uniquement consulter les id\u00e9es correspondant \u00e0 un statut, un responsable, un service, une cat\u00e9gorie ou tout autre crit\u00e8re de filtrage sp\u00e9cifique.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le bouton Colonnes peut \u00eatre utilis\u00e9 pour ajouter des colonnes suppl\u00e9mentaires sur le c\u00f4t\u00e9 gauche de la matrice. Cela permet aux utilisateurs d'inclure des informations suppl\u00e9mentaires sur les id\u00e9es tout en conservant les colonnes de notation disponibles \u00e0 des fins de comparaison.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" width=\"576\" height=\"876\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.45.22.png\" alt=\"Menu d\u00e9roulant des colonnes avec options de champ s\u00e9lectionnables\" class=\"wp-image-99682\" style=\"width:300px\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.45.22-8x12.png 8w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.45.22-197x300.png 197w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.45.22-200x304.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.45.22-337x512.png 337w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.45.22-400x608.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/05\/screenshot-2026-05-05-at-18.45.22.png 576w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capture d'\u00e9cran : Contr\u00f4les des colonnes et des filtres.<\/strong><br>Description : Afficher la partie sup\u00e9rieure droite de la matrice de d\u00e9cision, avec les boutons \u00ab Colonnes \u00bb et \u00ab Filtres \u00bb. La capture d'\u00e9cran doit montrer comment les utilisateurs peuvent ajuster les informations affich\u00e9es et affiner la s\u00e9lection des id\u00e9es dans la vue.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration et ajustements<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La matrice de d\u00e9cision d\u00e9pend de la fiche d'\u00e9valuation associ\u00e9e \u00e0 l'entonnoir d'id\u00e9es. La fiche d'\u00e9valuation d\u00e9finit les crit\u00e8res de notation qui apparaissent sous forme de colonnes et la mani\u00e8re dont chaque note est saisie.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour d\u00e9finir les crit\u00e8res qui apparaissent dans la matrice, consultez la configuration de la fiche d'\u00e9valuation du tunnel de conversion.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chemin de navigation : Innovation Studio \u2192 Id\u00e9es \u2192 S\u00e9lectionner un entonnoir \u00e0 id\u00e9es \u2192 Param\u00e8tres de l'entonnoir<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les administrateurs peuvent g\u00e9rer les tableaux de bord et la logique de notation dans les param\u00e8tres de l'application lorsque des changements de configuration sont n\u00e9cessaires.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chemin de navigation : Param\u00e8tres \u2192 Donn\u00e9es et structures \u2192 Tableaux de bord<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La modification de la configuration de la fiche d'\u00e9valuation peut avoir une incidence sur la mani\u00e8re dont les id\u00e9es sont \u00e9valu\u00e9es et sur le calcul des notes globales. V\u00e9rifiez les r\u00e9sultats de notation existants avant d'apporter des modifications \u00e0 un entonnoir actif.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Exemple pratique : Zones d'innovation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Innovationlands utilise un entonnoir \u00e0 id\u00e9es pour \u00e9valuer les nouvelles am\u00e9liorations \u00e0 apporter \u00e0 l'exp\u00e9rience des visiteurs dans ses parcs \u00e0 th\u00e8me. L'entonnoir contient des id\u00e9es telles qu'une am\u00e9lioration de la file d'attente virtuelle, un flux de commandes alimentaires personnalis\u00e9es et un nouveau concept d'attraction saisonni\u00e8re.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L'\u00e9quipe charg\u00e9e de l'innovation ouvre l'onglet \u00ab Matrice de d\u00e9cision \u00bb dans l'entonnoir \u00e0 id\u00e9es. Les colonnes de la fiche d'\u00e9valuation comprennent des crit\u00e8res relatifs \u00e0 la valeur pour le client, \u00e0 la faisabilit\u00e9 op\u00e9rationnelle, au potentiel commercial, \u00e0 l'alignement strat\u00e9gique et au risque de mise en \u0153uvre.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chaque id\u00e9e est examin\u00e9e ligne par ligne. L'\u00e9quipe lit le r\u00e9sum\u00e9 de l'IA dans la colonne du titre, ouvre la fen\u00eatre contextuelle de l'id\u00e9e lorsque plus de d\u00e9tails sont n\u00e9cessaires, puis note chaque crit\u00e8re directement dans la matrice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Une fois la notation effectu\u00e9e, la colonne \u00ab Note totale \u00bb indique quelles id\u00e9es sont globalement les plus prometteuses. L'\u00e9quipe trie les id\u00e9es par note totale et constate que l'am\u00e9lioration de la file d'attente virtuelle arrive en t\u00eate, car elle pr\u00e9sente une forte valeur ajout\u00e9e pour les clients, un bon alignement strat\u00e9gique et un risque de mise en \u0153uvre acceptable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L'\u00e9quipe s\u00e9lectionne les id\u00e9es les mieux class\u00e9es \u00e0 l'aide des cases \u00e0 cocher et applique la prochaine action de l'entonnoir disponible pour les faire avancer en vue d'une validation plus pouss\u00e9e ou de la cr\u00e9ation d'une proposition.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Meilleures pratiques<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Utilisez la matrice de d\u00e9cision une fois que les id\u00e9es s'appuient sur suffisamment d'informations pour pouvoir \u00eatre \u00e9valu\u00e9es correctement.<\/li>\n\n\n\n<li>Compl\u00e9tez les scores manquants avant de prendre des d\u00e9cisions d\u00e9finitives.<\/li>\n\n\n\n<li>Utilisez des filtres pour vous concentrer sur les id\u00e9es les plus pertinentes pour une session de r\u00e9vision.<\/li>\n\n\n\n<li>Classer par score total pour faciliter l'\u00e9tablissement de priorit\u00e9s, tout en examinant les crit\u00e8res sous-jacents avant de faire avancer les id\u00e9es.<\/li>\n\n\n\n<li>Veillez \u00e0 ce que la fiche d'\u00e9valuation soit en ad\u00e9quation avec les crit\u00e8res de d\u00e9cision utilis\u00e9s par l'\u00e9quipe charg\u00e9e de l'innovation.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Why this feature is needed The decision matrix view helps teams compare and score ideas inside an idea funnel in a structured way. It is used when multiple ideas need to be evaluated against the same scorecard criteria before deciding which ideas should move forward. Kanban and list views help users manage workflow and idea  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":99675,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_seopress_titles_title":"Decision matrix funnel view | Accept Mission","_seopress_titles_desc":"Learn how to use the decision matrix view in an innovation funnel to compare ideas and make better prioritization decisions.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"content-type":"","footnotes":"","_members_access_role":[],"_members_access_error":""},"doc_category":[249,198,254,199,293],"doc_tag":[214,205,209],"glossaries":[237,229],"knowledge_base":[317],"class_list":["post-99674","docs","type-docs","status-publish","has-post-thumbnail","hentry","doc_category-idea-funnels","doc_category-idea-management","doc_category-project-funnels","doc_category-project-portfolio","doc_category-scorecards","doc_tag-decision-support","doc_tag-innovation-studio","doc_tag-power-user","glossaries-decision","glossaries-power-user","knowledge_base-support"],"year_month":"2026-10","word_count":1269,"total_views":"1727","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Steven Kope","author_nicename":"steven","author_url":"#"},"doc_category_info":[{"term_name":"Idea Funnels","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge\/non-knowledgebase\/idea-funnels\/"},{"term_name":"Idea Management","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge\/support\/idea-management\/"},{"term_name":"Project Funnels","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge\/non-knowledgebase\/project-funnels\/"},{"term_name":"Project portfolio","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge\/support\/project-portfolio\/"},{"term_name":"Scorecards","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge\/support\/scorecards\/"}],"doc_tag_info":[{"term_name":"Decision Support","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge-tag\/decision-support\/"},{"term_name":"Innovation Studio","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge-tag\/innovation-studio\/"},{"term_name":"Power User","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge-tag\/power-user\/"}],"knowledge_base_info":[{"term_name":"Support","term_url":"https:\/\/www.acceptmission.com\/fr\/knowledge\/support\/","term_slug":"support"}],"knowledge_base_slug":["support"],"_links":{"self":[{"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/docs\/99674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/comments?post=99674"}],"version-history":[{"count":2,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/docs\/99674\/revisions"}],"predecessor-version":[{"id":127890,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/docs\/99674\/revisions\/127890"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/media\/99675"}],"wp:attachment":[{"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/media?parent=99674"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/doc_category?post=99674"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/doc_tag?post=99674"},{"taxonomy":"glossaries","embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/glossaries?post=99674"},{"taxonomy":"knowledge_base","embeddable":true,"href":"https:\/\/www.acceptmission.com\/fr\/wp-json\/wp\/v2\/knowledge_base?post=99674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}