{"id":95685,"date":"2026-04-02T11:19:59","date_gmt":"2026-04-02T09:19:59","guid":{"rendered":"http:\/\/www.acceptmission.com\/?post_type=docs&#038;p=95685"},"modified":"2026-04-16T12:33:04","modified_gmt":"2026-04-16T10:33:04","password":"","slug":"innovation-project-management","status":"publish","type":"docs","link":"https:\/\/www.acceptmission.com\/pt\/knowledge\/innovation-project-management\/","title":{"rendered":"Gest\u00e3o de projetos de inova\u00e7\u00e3o"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Porque \u00e9 que esta funcionalidade \u00e9 necess\u00e1ria<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quando uma ideia \u00e9 aprovada, o trabalho deixa de ser a recolha de contributos. Passa a ser uma quest\u00e3o de execu\u00e7\u00e3o, de acompanhamento do progresso, de propriedade, de prazos, de movimento de fases e de medi\u00e7\u00e3o de resultados. Sem um fluxo de trabalho de projeto estruturado, as equipas de inova\u00e7\u00e3o podem perder a visibilidade do que est\u00e1 a avan\u00e7ar e do valor que est\u00e1 a ser criado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A gest\u00e3o de projectos de inova\u00e7\u00e3o ajuda as equipas a manter o controlo do trabalho de inova\u00e7\u00e3o ativo. Cria uma forma clara de monitorizar as fases do projeto, acompanhar o progresso, comparar projectos e compreender como os esfor\u00e7os de inova\u00e7\u00e3o contribuem para os resultados comerciais.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O que \u00e9 esta funcionalidade<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A gest\u00e3o de projectos de inova\u00e7\u00e3o no Accept Mission \u00e9 o processo estruturado de gest\u00e3o de inova\u00e7\u00f5es aprovadas como projectos. Ajuda as equipas a monitorizar o progresso do projeto, a orientar os projectos atrav\u00e9s de fases definidas e a medir o sucesso da inova\u00e7\u00e3o ao longo do tempo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Os projectos no Accept Mission s\u00e3o geridos atrav\u00e9s de funis de projeto. Estes funis funcionam de forma semelhante aos funis de ideias, mas centram-se na execu\u00e7\u00e3o em vez de na revis\u00e3o de ideias. Os funis de projeto ajudam as equipas a organizar os projectos por equipa, departamento, pa\u00eds ou modelo de propriedade.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Na \u00e1rea de projectos, os utilizadores podem trabalhar com diferentes vistas, como a vista de lista, a vista Kanban e a vista de gr\u00e1fico de Gantt. Estas vistas apoiam a monitoriza\u00e7\u00e3o di\u00e1ria, a progress\u00e3o das fases e o conhecimento do portef\u00f3lio.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h_2381e9db70\">V\u00eddeo sobre projectos<\/h2>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-vimeo wp-block-embed-vimeo\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"video-shortcode\"><iframe title=\"Gest\u00e3o de Projetos de Inova\u00e7\u00e3o\" src=\"https:\/\/player.vimeo.com\/video\/409399195?dnt=1&amp;app_id=122963\" width=\"1200\" height=\"675\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write; encrypted-media; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\"><\/iframe><\/div>\n<\/div><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">N\u00edvel de acesso<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Utilizador avan\u00e7ado<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Voc\u00ea precisa de acesso \u00e0 \u00e1rea de Projetos no Est\u00fadio de Inova\u00e7\u00e3o para gerenciar o progresso do projeto. Podem ser necess\u00e1rias permiss\u00f5es de administrador para iniciar novos projectos, configurar funis de projectos ou ligar funis de ideias a funis de projectos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Percurso de navega\u00e7\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Caminho de navega\u00e7\u00e3o: Est\u00fadio de Inova\u00e7\u00e3o \u2192 Projectos<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Como utilizar esta funcionalidade<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A gest\u00e3o de projectos come\u00e7a quando uma inova\u00e7\u00e3o passa da sele\u00e7\u00e3o de ideias para a execu\u00e7\u00e3o. No Accept Mission, os projectos s\u00e3o utilizados para monitorizar o progresso, acompanhar os prazos, gerir as fases e compreender se o trabalho de inova\u00e7\u00e3o est\u00e1 a criar valor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Os projectos podem ser iniciados a partir de ideias aprovadas ou criados como novos projectos de raiz. Quando um projeto existe, pode ser gerido no funil de projeto relevante e revisto atrav\u00e9s de diferentes vistas de projeto, dependendo do tipo de vis\u00e3o geral necess\u00e1ria.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Instru\u00e7\u00f5es passo a passo<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Aberto <strong>Est\u00fadio de inova\u00e7\u00e3o<\/strong>.<\/li>\n\n\n\n<li>Ir para <strong>Projectos<\/strong>.<\/li>\n\n\n\n<li>Escolha se pretende rever projectos existentes ou iniciar um novo projeto.<\/li>\n\n\n\n<li>Se necess\u00e1rio, criar um projeto a partir de uma ideia aprovada ou iniciar um projeto completamente novo.<\/li>\n\n\n\n<li>Abrir o funil de projeto relevante.<\/li>\n\n\n\n<li>Utilizar as vistas dispon\u00edveis, tais como <strong>Vista de lista<\/strong>, <strong>Visualiza\u00e7\u00e3o Kanban<\/strong>, ou <strong>Vista do diagrama de Gantt<\/strong> dependendo do tipo de s\u00edntese do projeto de que necessita.<\/li>\n\n\n\n<li>Abra um cart\u00e3o de projeto ou um registo de projeto para atualizar detalhes como o progresso, o gestor de projeto, o prazo, a fase e as actualiza\u00e7\u00f5es de estado.<\/li>\n\n\n\n<li>Mova os projectos atrav\u00e9s do funil de projectos \u00e0 medida que avan\u00e7am de uma fase para a seguinte.<\/li>\n\n\n\n<li>Rever o valor, o investimento e a adequa\u00e7\u00e3o do projeto como parte do processo cont\u00ednuo de monitoriza\u00e7\u00e3o do projeto.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"632\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-1024x632.png\" alt=\"imagem\" class=\"wp-image-95686\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-200x124.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-300x185.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-360x222.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-400x247.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-600x371.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-768x474.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-800x494.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-1024x632.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-1200x741.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13-1536x949.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-13.png 1621w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Introdu\u00e7\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ao criar um projeto de inova\u00e7\u00e3o, \u00e9 importante acompanhar o progresso para que a inova\u00e7\u00e3o seja bem sucedida. Cada projeto de inova\u00e7\u00e3o tem de cumprir determinados crit\u00e9rios antes de poder passar \u00e0 fase seguinte.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Estas fases podem incluir a procura de problemas, a procura de solu\u00e7\u00f5es, a experimenta\u00e7\u00e3o, o caso de neg\u00f3cio, o desenvolvimento e a entrega. No Accept Mission, as equipas podem definir e gerir estes crit\u00e9rios atrav\u00e9s das defini\u00e7\u00f5es do projeto e da estrutura do funil do projeto.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Funis de projeto<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Os funis de projeto s\u00e3o os fluxos de trabalho estruturados utilizados para gerir projectos de inova\u00e7\u00e3o. Ajudam as equipas a organizar os projectos por responsabilidade e fluxo de execu\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tal como os funis de ideias, os funis de projectos podem ser criados e geridos separadamente. Isto permite separar os projectos para diferentes equipas, departamentos, pa\u00edses ou modelos de propriedade.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vista de lista<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A vista de lista fornece uma vis\u00e3o geral simples de todos os projectos ligados \u00e0 empresa ou ao funil de projeto selecionado. Cada coluna pode ser ordenada para ajudar os utilizadores a comparar rapidamente os dados do projeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A coluna do relat\u00f3rio mais recente baseia-se na data da \u00faltima modifica\u00e7\u00e3o efectuada a um projeto. Isto ajuda as equipas a identificar quais os projectos que foram actualizados mais recentemente.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"620\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-1024x620.png\" alt=\"imagem\" class=\"wp-image-95687\" style=\"aspect-ratio:1.6520392359318534;width:1110px;height:auto\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-200x121.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-300x182.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-360x218.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-400x242.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-600x363.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-768x465.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-800x484.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-1024x620.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-1200x726.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14-1536x930.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-14.png 1614w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Visualiza\u00e7\u00e3o Kanban<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">O quadro Kanban \u00e9 a vista de painel predefinida para os projectos. Mostra todos os cart\u00f5es de projeto agrupados por fase e facilita a visualiza\u00e7\u00e3o do progresso do projeto ao longo de todo o fluxo de trabalho.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cada cart\u00e3o de projeto apresenta informa\u00e7\u00f5es \u00fateis, tais como a barra de progresso, o gestor de projeto e o prazo. Pode facilmente editar estes valores no formul\u00e1rio de detalhes do projeto, clicando num cart\u00e3o de projeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para atualizar a progress\u00e3o do projeto, cada cart\u00e3o de projeto pode ser movido manualmente para a fase seguinte atrav\u00e9s de arrastar e largar. Em cada fase, os detalhes financeiros s\u00e3o combinados para mostrar o lucro por fase na parte inferior da coluna de cada fase. O lucro baseia-se nas receitas estimadas menos os investimentos no separador de pontua\u00e7\u00e3o das defini\u00e7\u00f5es do projeto.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"627\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-1024x627.png\" alt=\"imagem\" class=\"wp-image-95688\" style=\"aspect-ratio:1.632548944582616;width:1032px;height:auto\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-200x123.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-300x184.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-360x221.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-400x245.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-600x368.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-768x470.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-800x490.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-1024x627.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-1200x735.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15-1536x941.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-15.png 1626w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Vista do diagrama de Gantt<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A vista do diagrama de Gantt ajuda os utilizadores a compreender o tempo do projeto entre departamentos. Cada barra representa um projeto e os projectos s\u00e3o colocados sob o departamento que lhes est\u00e1 associado nas defini\u00e7\u00f5es do projeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ao passar o mouse sobre um projeto no gr\u00e1fico, informa\u00e7\u00f5es adicionais podem ser mostradas, como o t\u00edtulo do projeto, a data de in\u00edcio e a data de t\u00e9rmino. Os utilizadores podem determinar a janela de tempo apresentada introduzindo datas nos campos de e para ou utilizando o cursor por baixo do gr\u00e1fico.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"640\" src=\"http:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-1024x640.png\" alt=\"imagem\" class=\"wp-image-95691\" style=\"aspect-ratio:1.5996334173418592;width:975px;height:auto\" srcset=\"https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-18x12.png 18w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-200x125.png 200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-300x188.png 300w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-360x225.png 360w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-400x250.png 400w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-600x375.png 600w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-768x480.png 768w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-800x500.png 800w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-1024x640.png 1024w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-1200x750.png 1200w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16-1536x960.png 1536w, https:\/\/www.acceptmission.com\/wp-content\/uploads\/2026\/04\/image-16.png 1614w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Iniciar um projeto de inova\u00e7\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Como administrador, pode iniciar um projeto de inova\u00e7\u00e3o com base numa das ideias de inova\u00e7\u00e3o das miss\u00f5es Caixa de entrada, Sele\u00e7\u00e3o ou Idea\u00e7\u00e3o. Tamb\u00e9m pode iniciar um projeto completamente novo a partir do zero.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Com os Projectos, o administrador pode monitorizar o estado do projeto, a fase, as actualiza\u00e7\u00f5es de estado, os prazos futuros, a adequa\u00e7\u00e3o estrat\u00e9gica, o investimento em tempo e dinheiro e o valor criado. Dentro de um projeto, podem tamb\u00e9m ser iniciadas novas miss\u00f5es, como uma miss\u00e3o de idea\u00e7\u00e3o, para ajudar a fazer avan\u00e7ar o trabalho.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O Accept Mission mant\u00e9m automaticamente uma lista de pend\u00eancias das actividades do projeto. A plataforma foi concebida para ajudar as equipas de inova\u00e7\u00e3o a acompanhar os projectos, monitorizar o progresso e criar valor, enquanto a execu\u00e7\u00e3o detalhada das tarefas pode ser gerida noutras ferramentas operacionais, sempre que necess\u00e1rio.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configura\u00e7\u00e3o e ajustes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A gest\u00e3o de projectos \u00e9 moldada pela configura\u00e7\u00e3o dos funis de projeto e pelas defini\u00e7\u00f5es de projeto ligadas. Reveja cuidadosamente a estrutura do funil de projeto para se certificar de que as fases reflectem o processo de execu\u00e7\u00e3o que a sua organiza\u00e7\u00e3o pretende seguir.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isto pode incluir fases como a procura de problemas, a procura de solu\u00e7\u00f5es, a experimenta\u00e7\u00e3o, o caso comercial, o desenvolvimento e a entrega. A defini\u00e7\u00e3o clara destes crit\u00e9rios ajuda as equipas a compreender o que \u00e9 necess\u00e1rio para que um projeto possa passar \u00e0 fase seguinte.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Se a sua organiza\u00e7\u00e3o utiliza diferentes fluxos de trabalho de projeto para diferentes departamentos ou pa\u00edses, crie funis de projeto separados para manter a propriedade da execu\u00e7\u00e3o e os relat\u00f3rios claros.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Exemplo pr\u00e1tico - Innovationlands<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A Innovationlands utiliza o Accept Mission para transformar ideias selecionadas de atrac\u00e7\u00f5es e experi\u00eancias de h\u00f3spedes em projectos de inova\u00e7\u00e3o estruturados. Depois de um novo conceito de atra\u00e7\u00e3o ser aprovado no funil de ideias, a equipa de inova\u00e7\u00e3o inicia um projeto e coloca-o no funil de projectos relevante para execu\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O projeto passa por fases como o desenvolvimento do conceito, a valida\u00e7\u00e3o da viabilidade, o business case, a prepara\u00e7\u00e3o da constru\u00e7\u00e3o e a entrega. A equipa utiliza a vista Kanban para monitorizar os projectos que est\u00e3o a avan\u00e7ar, a vista de lista para comparar os dados do projeto e o gr\u00e1fico de Gantt para compreender o tempo em todos os departamentos, tais como Opera\u00e7\u00f5es do Parque, Experi\u00eancia dos H\u00f3spedes e Tecnologia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para um projeto de atra\u00e7\u00e3o de realidade mista, a Innovationlands acompanha o gestor de projeto, o prazo, o investimento previsto e a percentagem de progresso no cart\u00e3o de projeto. \u00c0 medida que o projeto avan\u00e7a nas suas fases, a equipa pode monitorizar se ainda est\u00e1 alinhado com o business case original e se est\u00e1 pronto para o pr\u00f3ximo ponto de decis\u00e3o. Isto ajuda a Innovationlands a gerir a execu\u00e7\u00e3o da inova\u00e7\u00e3o com mais estrutura e maior visibilidade em todo o portef\u00f3lio.<\/p>","protected":false},"excerpt":{"rendered":"<p>Why this feature is needed Once an idea is approved, the work is no longer about collecting input. It becomes about execution, progress tracking, ownership, deadlines, stage movement, and measuring results. Without a structured project workflow, innovation teams can lose visibility on what is moving forward and what value is being created. Innovation project management  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_seopress_titles_title":"Innovation project management help | Accept Mission","_seopress_titles_desc":"Learn how to use innovation project management in Accept Mission to manage innovation projects, portfolios and execution workflows.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"content-type":"","footnotes":"","_members_access_role":[],"_members_access_error":""},"doc_category":[258,254],"doc_tag":[],"glossaries":[],"knowledge_base":[317],"class_list":["post-95685","docs","type-docs","status-publish","hentry","doc_category-portfolio-overview","doc_category-project-funnels","knowledge_base-support"],"year_month":"2026-10","word_count":1198,"total_views":"2567","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Steven Kop","author_nicename":"steven","author_url":"#"},"doc_category_info":[{"term_name":"Portfolio Overview","term_url":"https:\/\/www.acceptmission.com\/pt\/knowledge\/non-knowledgebase\/portfolio-overview\/"},{"term_name":"Project Funnels","term_url":"https:\/\/www.acceptmission.com\/pt\/knowledge\/non-knowledgebase\/project-funnels\/"}],"doc_tag_info":[],"knowledge_base_info":[{"term_name":"Support","term_url":"https:\/\/www.acceptmission.com\/pt\/knowledge\/support\/","term_slug":"support"}],"knowledge_base_slug":["support"],"_links":{"self":[{"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/docs\/95685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/comments?post=95685"}],"version-history":[{"count":0,"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/docs\/95685\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/media?parent=95685"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/doc_category?post=95685"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/doc_tag?post=95685"},{"taxonomy":"glossaries","embeddable":true,"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/glossaries?post=95685"},{"taxonomy":"knowledge_base","embeddable":true,"href":"https:\/\/www.acceptmission.com\/pt\/wp-json\/wp\/v2\/knowledge_base?post=95685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}